Prepared by Northwest Hydraulic Consultants
From August 5th to 10th, 2013, 4,200 metric tones of washed and screened spawning gravel was placed in the Campbell River, at Site 7. Site 7 is located downstream of the BC Hydro (BCH) John Hart Generating Station, between the right bank and downstream end of First Island. Since 2006, this was the third gravel placement project at Site 7, thus it is referred to as Site 7-III.